Shopping Cart

Your cart is empty.

Your cart is empty.

Schluter Ditra-Heat-Duo-PS Peel and Stick Uncoupling Membrane with Sound Control and Thermal Break - Ideal for Multi-Story Construction - 5/16-Inch Thickness, 108 Square Feet Roll - DHDPS810M

Free shipping on orders over $29.99

$509.90

$ 99 .00 $99.00

In Stock

About this item

  • Optimized Comfort - Seamlessly integrates sound control and a thermal break to reduce noise and heat loss, ensuring an ideal environment for both residential and commercial applications in high-rise structures.
  • Flexible Solutions - Supports customized heat settings with optional Ditra-Heat-HK cables, enabling you to tailor a heated, even tile floor to suit any space.
  • Tile Protection - Features an uncoupling layer that effectively absorbs substrate movements, safeguarding your tiles against stress-induced cracks and delamination.
  • Waterproofing - Offers superior waterproofing with its polypropylene composition, effectively shielding moisture-sensitive substrates in modern construction environments from moisture penetration.
  • Effortless Installation - This peel-and-stick membrane simplifies tile installation by eliminating the need for thin-set, ensuring a faster setup and a strong bond.



Product Description

Schluter A+

Ultimate Tile Protection

Membranes

Prevent tile cracks and water damage with our specialized membranes

Schluter Ditra Membrane

DITRA-HEAT-DUO-PS peel and stick membrane features a pressure-sensitive adhesive (PSA) to bond the membrane to the substrate, replacing the need for thin-set mortar. The peel and stick versions integrate customizable, comfortable electric floor warming with the same core functions of DITRA-HEAT: uncoupling, waterproofing, vapor management, and support to ensure a long-lasting installation. DITRA-HEAT-DUO-PS features an integrated thermal break to reduce impact sound transmission through floor-ceiling assemblies, reduce heat loss to the substrate, and improve floor warming response time.

Schluter Ditra

How to Install Your Ditra Membrane

Note: Type, thickness, and format of the tile or stone surface covering must be suitable for the intended application. Minimum tile format is 2" x 2" (5 cm x 5 cm).

1. Remove release liner from DITRA-HEAT-DUO-PS membrane.

2. Apply peel and stick membrane to the floor, fleece/adhesive side down. Solidly embed the matting into the substrate using a float, screed trowel, or DITRA-ROLLER. Proper installation results in full contact between the adhesive and substrate beneath.

* When using the DITRA-ROLLER, place a weight (e.g., bags of mortar/grout or box of tile) not to exceed 75 lbs on the DITRA-ROLLER shelf. Slowly move the roller from one end of the matting to the other, slightly overlapping successive passes.

3. Abut adjacent sheets and align the studs on the top of the matting to make subsequent heating cable installation easier.

4. The DITRA-HEAT-E-HK heating cables can now be installed. Installation instructions are covered under the DITRA-HEAT-E-HK product page. Note: Tile can be installed directly over the DITRA-HEAT membrane immediately after the DITRA-HEAT-E-HK cables have been installed using an unmodified thin set. Please refer to the Schluter-DITRA-HEAT Installation Handbook below for complete DITRA-HEAT system instructions.

About Us

Always One Step Ahead of the Times!

At Schlüter-Systems, we pride ourselves on being pioneers in the tile assembly industry. Founded in 1966 by Werner Schlüter, we continue to meet the evolving demands of the industry by developing practical and effective solutions for tile installation challenges. Today, Schlüter-Systems' has evolved from a modest idea into a company with over 40 product lines recognized and utilized in various countries around the world, maintaining our commitment to innovation, quality, and service.

Schluter
  • DITRA-HEAT-DUO-PS and DITRA-HEAT-DUO feature the same plastic material and configuration. If seams, corners, and connections to other waterproofing components are carefully sealed, DITRA-HEAT-DUO-PS * will provide waterproofing for the substrate.

  • DITRA-HEAT-DUO-PS can be repositioned during installation. Plan your layout first, and don't use the roller or heavy float until the membrane is fully in place and positions are final.


Bob
Reviewed in the United States on January 5, 2025
Product was amazing and the customer experience from the seller was awesome, they reconfigured the whole setup and sent my parts quickly.
Customer
Reviewed in the United States on November 23, 2023
Was the exact product I needed and came when it should. Only complaint is that the packaging should be better. The paper wrap was stuck on the end of the peel and stick, making the end strip unusable. Not sure if it's this company or the manufacturer.
Recommended Products

$98.99

$ 40 .99 $40.99

5.0
Select Option